Conveyor engineering: get the concept right before you invest

Conveyor engineering largely determines what a bulk material handling system costs to build and to run. Getting the concept and layout stages right is also critical for high conveyor availability. The majority of potential issues are cheapest to fix while the conveyor exists only as a model.

When planning a new conveyor at a mine, port or power plant, evaluating potential conveyor options early helps find the optimal concept and layout. This article explains what ROXON’s conveyor engineering consulting covers, which design errors it prevents and what you need to get started.

What conveyor engineering decides for your plant

Conveyor engineering is the design of conveyors and of the material handling system around them. The drawing is only the visible result. The real work is finding the right concept: how material moves from its source to the point of use, which machines handle it on the way and how layout, elevations and transfer points fit together.

Those choices answer the questions that set the plant’s operating cost for decades. How many machines, and what kinds, does the system need? How long are the conveyors? Where does the material change direction? How much maintenance does each choice require?

Consulting precedes execution engineering

A material handling project typically includes two kinds of engineering. Execution engineering is the detailed design produced once the investment is decided. It turns a chosen concept into drawings for manufacturing and installation.

Conveyor engineering consulting happens earlier, in the pre-feasibility and feasibility phases. The goal is to find the best concept and to give investment cost indications for the alternatives.

A typical project includes a multi-discipline team of civil and process designers. Our role in it is that of the material handling equipment specialist. We advise on equipment selection and equipment concepts. ROXON’s services in this phase cover layout engineering, material flow simulations, laser scanning, conveyor calculations and helping to prepare RFQ material.

Design errors that are cheap on paper and expensive on site

The most expensive errors in conveyor engineering are concept errors. They are rarely visible in a drawing, and they are very hard to correct once concrete and steel are in place. Prestudies help to catch them early. Here are typical errors we have seen over the years.

A storage concept that does not suit the material.

A storage solution can look fine on paper and still cause blockages. Examples include choosing a silo for a material that flows poorly out of a silo, or using a reclaimer as a stockpile discharger for a material it does not suit. If this error only comes to light during commissioning, the equipment has to be replaced.

Transfer stations without enough space or height.

At a transfer station, material drops from one conveyor onto the next through a hopper or chute. The hopper walls need a steep enough slope for the material to slide instead of building up. If the layout is fixed to elevations that leave too little height, the hopper cannot be built to work. Correcting it afterwards is close to impossible, because the conveyors on both sides would have to move. This is why we often change space reservations during the feasibility study.

No room to handle carryback.

Some material always sticks to the belt after the discharge point. Belt cleaners scrape it off, and the transfer station needs a route to return that material into the main flow. Without space for cleaners and that return route, carryback drops along the return run. It builds up under the conveyor, wears the return idlers and creates daily clean-up work.

Climate that was not designed for.

Moist material can freeze into large lumps in cold weather. Those lumps block chutes and damage belts. The concept may need added heating, more screening to remove large lumps, or crushing to a smaller size. In Nordic conditions this belongs in the concept from the start. The aim is simple: no system goes into production with a concept that does not work.

ROXON service person with conveyor

How a conveyor prestudy narrows the options

Pre-feasibility study: everything is open

A pre-feasibility study usually starts from a process flow diagram or a preliminary 3D layout model that shows the planned process. The ore has to get from the pit to the plant, and the rest is open.

Material data comes next: what the material is, its lump size and its specific weight. The material decides which equipment can work, so this data shapes every concept.

Our experts then look for concepts for the whole material handling system, sketch alternatives at a rough level, calculate each one and compare them. Each choice rests on a benefit analysis that compares the strengths and weaknesses of different alternatives. Cost estimates at this stage are usually accurate to within about ±35%.

Feasibility study: one concept in detail

In the feasibility study, the most promising route is usually already determined. One concept, or at most a few, goes forward. The technical design and the equipment cost estimate become more precise, and cost accuracy tightens to about ±20%. A concept can still change if a better idea turns up.

To support decision-making, it helps if the concepts are presented visually and not as pages of text. You often have to take our proposals to your own organisation, and a clear visual format helps people there reach the same conclusion. While AI tools are entering the design phases, judging what makes a good equipment or system concept still takes people, conversation and decades of experience.

Conveyor engineering consulting also includes preparing material handling system specifications that you can use for your RFQs. The study ends in a report that sets out the alternatives investigated, presents the chosen solutions and gives the conclusions.

Heavy bulk handling needs wear and flow control from day one

Bulk material handling at mines, ports and power plants covers more than conveyors. Hoppers, stackers, reclaimers, belt feeders, shiploaders and other fixed or mobile equipment all have to work as one system.

High availability depends on getting wear control and material flow control right. That is why wear plates and wear resistance are part of the concept from the start. With DEM (discrete element method) simulations of the material flow, especially at the transfer points between conveyors, we can see where the material hits the chute, how fast it moves and where it may block. These simulations can already be run in the feasibility phase to help find the correct layout.

The simplest concept delivers the highest availability

A simple system looks easy to come up with. In practice it is the result of long work. Usually many complex alternatives need to be sketched out before the simplest one appears.

Simplicity pays twice. It lowers the investment: fewer machines, shorter conveyors and simpler equipment doing the same job. It also lowers operating costs, because there is less to maintain and fewer parts can break.

Availability follows from the same choices. Four factors drive it: how simple the equipment is, how proven each equipment concept is, wear control and material flow control. Every extra technical feature adds components that can fail. A good prestudy ranks function and availability first and cost second.

Cost still decides between working options. In some studies we have calculated CAPEX and OPEX for different layout concepts and built cumulative cost curves. They show the rough total cost of each layout over a chosen operating period, so you compare lifetime cost and not only purchase price. Our article on overland conveyor engineering takes the same lifecycle view.

Case: a screening line in a restricted existing space

In an existing plant, the space and height questions above get harder, because the walls and elevations are already fixed. That was the starting point for our client SMA Mineral in Oxelösund, Sweden.

Limestone was brought in by trucks. It had to be screened into different fractions and fed into the existing silos. We searched for a layout solution for the material handling system that would make this possible.

ROXON pre-engineered a solution into the existing restricted space. It fulfilled the process requirements reliably and safely within the given boundaries.

Fix the concept while it is still a model

Every concept problem is cheapest to fix while the plant exists only as a model. A hopper slope, a storage concept or a transfer station height costs hours to change in a study and months to change on site. At ROXON, we also build conveyors. That gives us a direct reason to recommend concepts that work in operation, not only on paper.

If you are planning a material handling investment, send us your process flow diagram, your preliminary layout model and your material data. We will review them with you and show where the concept can be simplified, and where it risks blockages or wear. Contact our conveyor engineering team for more information.

Frequently asked questions about conveyor engineering

What does a conveyor feasibility study include?

A feasibility study develops one or a few chosen conveyor concepts in detail. It refines the technical design and the equipment cost estimate, checks critical transfer points with material flow simulations and produces specifications for RFQs. It ends in a report with the alternatives investigated, the chosen solution and the conclusions.

What information is needed to start a conveyor prestudy?

The most useful inputs are a process flow diagram and a preliminary 3D layout model. Material data matters just as much: material type, lump size and specific weight. A short interview about your goals and the work done so far completes the picture.

What is the difference between conveyor engineering consulting and execution engineering?

Conveyor engineering consulting happens before the investment decision. It finds the best concept and gives cost indications for the alternatives. Execution engineering comes after the decision and turns the chosen concept into detailed drawings for manufacturing and installation.

When is dynamic analysis needed in conveyor design?

Dynamic analysis models how the belt behaves during starts and stops. It becomes essential when a conveyor is longer than one kilometre, because belt tension changes along the route can then damage the belt, the pulleys or the drives.